Case Study: Sherborne Wharf new build 

Case Study: Sherborne Wharf new build 

When working on multi-million-pound developments, contractors can deal with a plethora of suppliers to deliver one segment of the project. For new-build specialists, Stewarts Plumbing & Heating, it was important to find one supplier to provide all plumbing and drainage products for its work on Birmingham’s Sherborne Wharf development. Wavin provided a full portfolio of solutions alongside technical support and training to enable smooth plumbing installation. 

The waterside redevelopment at Sherborne Wharf will eventually see over 80 blocks of residential buildings in the heart of Birmingham city centre. Part of this project is five blocks comprising 203 one, two and three-bedroom apartments by Crest Nicholson.

Stewarts wanted to provide a streamlined installation process and find a ‘one stop shop’ for plumbing and drainage solutions ahead of installation that would begin in May 2019. Firstly, the installer required a flexible and durable drainage system than could service several entire multi-occupancy buildings. Stewarts worked with the experts at Graham Plumbing Merchants, who recommended Wavin’s HDPE offering, and the manufacturer’s wider portfolio.

James Yiend, Technical Sales Manager for above ground at Wavin, said: “We spoke with the Stewarts team about what they needed to make sure the client was happy, and we worked together to find the best full-service solution.”

Glenn Morton, Project Manager at Stewarts, said: “We had a preference to work with just one manufacturer for all solutions for plumbing and drainage if possible, as it would make the process much easier in terms of delivery management.

“Through Graham’s we were able to work very closely with the Wavin team to make sure we were getting the best products for each element of the project. HDPE was an absolute must for us, and then Osma and Tigris K1 ticked the boxes for us to ensure reliable drainage throughout the buildings.”

Wavin’s HDPE was chosen for the basement car park area, as its durability and elasticity enables to pipes to deal with vibrations potentially encountered in this environment. The pipes are easy and quick to install – important for such a large project – and are ideally suited to outdoor exposure, being able to withstand up to -40oC temperatures.

Robert Thompson, Regional Sales Manager for Graham Plumbing Merchants, said: “When Stewarts came to us for our expertise on manufacturers who could supply a full project plumbing and drainage solution and support, Wavin was a clear choice. We’ve found it’s a very popular brand and the team are always happy to help both us and the contractors to deliver the best service.”

James Yiend said: “This project is a great example of how collaboration between manufacturer, merchant and installer can find a full system solution and make the entire process, from choosing product to installing it at the project, as smooth as possible.”

Related posts